Client | Eldonia Community Based H.A.
EA & QS | Tweeds
Architect | KKA Architects
Structural Engineer | Sutcliffe Engineer
Start on Site | March 2010
Completion | September 2011

Canalside Park, Liverpool

Design and the construction of 40, two bed apartments for both rent and outright sale constructed to CfSH level 3.  The part steel frame and part load beams structure was constructed of precast piles and gravel beams and clad in facing brick with ‘floating’render facade.